EmeSeal System Installation
- Area is cleared of all old debris.
- Existing water problems (If any) are corrected.
- Radon gas dispersing drain fabric is placed over existing soil.
- Radon gas collection pipe and ventilation pipe
are installed.
- Moldable roll adhesive is attached along top edge of
foundation wall.
- Waterproof insulating blanket is placed over foundation wall and attached to moldable adhesive, providing an airtight seal.
- EmeSeal floor liner is rolled out over drain fabric and bonded together at
all seams.
- All voids around pipes, sump pumps, floor supports,
etc. are sealed.
- Optional: EmeCeiling heat shield is stapled to bottom
of floor joist (foil side up).
- Final inspection of area is performed and crawlspace is ready for immediate
use.

|
|